Two-core tee splitter, IP68 sealed, screw terminal assembly, one inlet feeding two outlet runs.
This M20 tee splitter solves a very practical installation problem: when a two-core supply line has to feed two luminaires, two sensor heads or two small motors that sit several metres apart, the conventional answer is a run of extra cable plus a junction box. The tee adapter replaces both. It takes one incoming two-pin cable, divides the conductors internally and hands them out through two independently sealed outlets, so the whole distribution point fits in the palm of a hand and can be mounted anywhere the cable already passes.
Assembly is deliberately tool-light. The shell opens on a threaded M20 collar, the two conductors land on clearly marked screw terminals, and a single locking ring presses the sealing insert down onto the jacket. Because the gland grips the cable jacket rather than the individual cores, the joint also works as a strain relief point, which is what usually fails first on taped or heat-shrink splices exposed to wind load and cable movement. Once the collar is hand-tightened plus a quarter turn, the assembly is watertight to IP68 and can be buried in a shallow conduit trench, tucked under decking or left on an outdoor facade for years.
Key Features| Parameter | Specification |
|---|---|
| Configuration | T-shape, 1 inlet to 2 outlets, 2 contacts per port |
| Thread size | M20 x 1 (M12 and M16 versions on request) |
| Rated current | 10 A to 16 A per contact |
| Rated voltage | 300 V to 600 V AC |
| Ingress protection | IP67 standard, IP68 when fully mated and capped |
| Cable acceptance | PG7 gland for 4 to 6.5 mm, PG9 gland for 6 to 8 mm, up to 11 mm on special builds |
| Conductor range | 0.5 to 2.5 mm² (20 to 14 AWG), screw clamp |
| Contact resistance | ≤ 5 mΩ |
| Insulation resistance | ≥ 100 MΩ at 500 V DC |
| Dielectric strength | 1500 V AC for 1 minute, 4000 V AC on request |
| Operating temperature | -40°C to +85°C, +105°C variant available |
| Shell material | Glass-fibre reinforced PA66, PBT option, nickel plated brass or 316 stainless steel option |
| Mating cycles | ≥ 500 cycles (plastic shell), ≥ 2000 cycles (metal shell) |
| Compliance | RoHS, CE, UL recognised cable option, IEC 61076-2-101 for M12 builds |
The splitter is most often specified where a single circuit has to reach two nearby loads and the budget for a separate distribution enclosure is not there. Typical jobs include outdoor LED floodlight pairs on a facade, garden and pathway bollards fed from one buried line, photovoltaic module strings on a rooftop frame, bilge and deck lighting on small craft, irrigation valve solenoids, and temperature or humidity probes mounted at two points along one cable route. It also earns its place inside equipment, where a two-core 24 V or 230 V feed has to supply two fans, two indicator stacks or two small gear motors inside a crowded cabinet.
Packaging and Quality AssuranceEach splitter ships as a complete kit: the tee body, matching male and female end pieces, sealing rings and gland inserts sized for the ordered cable diameter. Units are packed in individual polybags, then in a carton of 100 sets with a size of 10 x 10 x 10 cm per inner pack, which keeps freight volume low for container consolidation. Every production batch is sample tested for dielectric strength, insulation resistance and immersion at 1 m for 30 minutes before packing, and a test record can be issued against the order number. Lead time is 7 to 15 days for standard configurations, with annual capacity of about 10 million harness sets. Custom cable lengths, pre-terminated tails, colour coding and private labelling are all handled in house, and an MOQ of 100 sets applies to standard builds.